{"id":5323,"date":"2009-10-17T15:51:02","date_gmt":"2009-10-17T15:51:02","guid":{"rendered":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/"},"modified":"2023-04-21T12:14:02","modified_gmt":"2023-04-21T12:14:02","slug":"2009-craftsmanship-awards-winners","status":"publish","type":"craftsmanship_awards","link":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/","title":{"rendered":"2009 Craftsmanship Awards Winners"},"content":{"rendered":"

Concrete<\/a> | Doors & Windows<\/a> | Electrical<\/a> | Finishes<\/a> | Masonry<\/a> | Mechanical<\/a> | Metals<\/a> | Sitework<\/a> | Special Construction<\/a> | Woods & Plastics<\/a><\/p>\n

A \"Star\" next to the project name indicates that the project was nominated for the special Star Award<\/p>\n

Concrete<\/span><\/h2>\n

Cast-in-Place Concrete<\/h4>\n

(including formwork & reinforcement)<\/p>\n

Miguel Fuentes, Juan Garcia, Bryant McDowell, Craig Murrell, Charles Pooler, Jose Reyes – Clark Concrete Contractors, LLC<\/em><\/strong><\/h6>\n

Project Name:<\/strong> 300 New Jersey Avenue, Washington, DC
\nArchitect:<\/strong> HKS, PC
\nEngineer:<\/strong> SK&A Structural Engineers, PLLC
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Carlos Gomez, Daniel Jenkins, Glen Jenkins, Mackie Lee Jenkins, Jr., Mackie Lee Jenkins, Sr., Hector Palanco – Southland Concrete Corporation<\/em><\/strong><\/h6>\n

Project Name:<\/strong> American Pharmacists Association Headquarters, Washington, DC
\nArchitect:<\/strong> HartmanCox Architects
\nEngineer:<\/strong> Thornton Tomasetti
\nGeneral Contractor:<\/strong> Tishman Construction Corporation of DC<\/p>\n

Clarence Bowling, Santos Fuentes, Benjamin Hernandez, Jose Rivera, Ramon Rivera, Wilfredo Urquilla – Clark Concrete Contractors, LLC<\/em><\/h6>\n

Project Name:<\/strong> Square 70155 M Street, SE \/ Navy Yard Metro Entrance, Washington, DC
\nArchitect:<\/strong> Davis Carter Scott
\nEngineer:<\/strong> SK&A Structural Engineers, PLLC
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Precast Concrete<\/h4>\n

(fabrication and\/or installation)<\/p>\n

Len Broomhead, Stephanie Golia, George Headley, Harold Horlings, Jeff Kerton, Paul Learn – Modern Mosaic Ltd.<\/em><\/strong><\/h6>\n

Project Name:<\/strong> 505 9th Street Office Building, Washington, DC
\nArchitect:<\/strong> HartmanCox Architects
\nEngineer:<\/strong> Lehman Smith McLeish
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Rolando Reyes – Hernandes, Jose Ambriz-Garcilazo, Pedro Reyes-Garcilazo, Mike Lackey, Frank Orren, Mark Williams – Arban & Carosi, Inc.<\/em><\/h6>\n

Project Name:<\/strong> American Pharmacists Association Headquarters, Washington, DC
\nArchitect:<\/strong> HartmanCox Architects
\nGeneral Contractor:<\/strong> Tishman Construction Corporation of DC<\/p>\n

Special Concrete Finishes<\/h4>\n
Edgar Bonilla, Jose Lazo, Angel Lopez, Armando Medina, Diego Ortiz, Pedro Valle – Miller & Long Co., Inc.<\/em><\/h6>\n

Project Name:<\/strong> United TherapeuticsPhase 2A, Silver Spring, MD
\nArchitect:<\/strong> Schick Goldstein Architects, PC
\nEngineer:<\/strong> Shemro Engineering, LLC
\nGeneral Contractor:<\/strong> The Whiting\u2013Turner Contracting Company<\/p>\n

Paul Bates, Santos Omar Flores, Carlos Gonzalez, Noe Osorto, Jose Salvador, William Soriano – Miller & Long Co., Inc.<\/em><\/h6>\n

Project Name:<\/strong> Station Place III, Washington, DC
\nArchitect:<\/strong> Kevin Roche John Dinkeloo & Associates LLC
\nEngineer:<\/strong> Thornton Tomasetti
\nGeneral Contractor:<\/strong> Balfour Beatty Construction<\/p>\n

Doors & Windows<\/span><\/h2>\n

Curtain Walls<\/h4>\n

Ashmore Clark, Jimmy Eshelman, Donnie Powell, Bobby Spiker, Ted Wright, Donnie Young – TSI Exterior Wall Systems, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Nationals Park, Washington, DC
\nArchitect:<\/strong> HOK \/ Devrouax & Purnell Joint Venture
\nEngineer:<\/strong> Thornton Tomasetti \/ ReStl, A Joint Venture
\nGeneral Contractor:<\/strong> Clark \/ Hunt \/ Smoot, A Joint Venture<\/p>\n

Rafael Depaz, Gary Gray, James Messing, Robert Sullivan, Israel Vasquez – Permasteelisa\u2013CS<\/em><\/h6>\n

Project Name:<\/strong> Waterview, Arlington, VA
\nDesign Architect:<\/strong> Pei Cobb Fried & Partners
\nConsultant, Onsite Designer:<\/strong> HKS, PC
\nHotel Interior Designer:<\/strong> Cheryl Rowley Design
\nCondominium Interior Designer:<\/strong> Hartman Design Group
\nEngineer:<\/strong> Tadjer Cohen Edelson Associates, Inc.
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Electrical<\/span><\/h2>\n

Lighting Systems<\/h4>\n

Danny Bugher, Mike Cuquet, Charles DePhillip, Jr., Joe Foster, Isaiah Simmons, Todd Wheeler – Truland Systems Corporation<\/em><\/h6>\n

Project Name:<\/strong> Gaylord National Resort and Convention Center, National Harbor, MD
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> Flack & Kurtz
\nGeneral Contractor:<\/strong> Perini\/Tompkins, Joint Venture<\/p>\n

Bruce Clodfelter, Sr., Rick Curl, Wayne Reep, Michael Shannon, Richie Wells – Dynalectric Company<\/em><\/h6>\n

Project Name:<\/strong> DLA Piper, Washington, DC
\nArchitect:<\/strong> Lehman Smith McLeish
\nEngineer:<\/strong> TOLK, Inc.
\nGeneral Contractor:<\/strong> HITT Contracting Inc.<\/p>\n

Rick Arnold, Danny Bennett, Frank Bryant, Theresa Jack, Tim McGuire, Rick Thomas – J.E. Richards, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Corporate Executive Board, Arlington, VA
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> TOLK Inc.
\nGeneral Contractor:<\/strong> James G. Davis Construction Corporation<\/p>\n

Power Generation, Distribution and Switchgear<\/h4>\n
Bernard (Bernie) Long, Luis Paredes, Edward A. Potts, Jr., Walter Williams – Dynalectric Company<\/em><\/h6>\n

Project Name:<\/strong> FDA Data Center, Silver Spring, MD
\nArchitect\/Engineers:<\/strong><\/strong> KlingStubbins\/RTKL
\nGeneral Contractor:<\/strong> Grunley Construction Company, Inc.<\/p>\n

Guy Andes, Jason Aston, Matt Bateman, Eric Daum, Jim Gyory, Jim Means – John E. Kelly & Sons Electrical Construction, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Anacostia Pumping Station Project, Washington, DC
\nArchitect:<\/strong> Whitman, Requardt & Associates, LLP
\nEngineer:<\/strong> Shah & Associates
\nGeneral Contractor:<\/strong> W. M. Schlosser Co., Inc.<\/p>\n

Fred Gast, Ron Harris, Tim Holbrook, John Marlow, Chuck McClay, Tom Moore – Power Solutions, LLC<\/em><\/h6>\n

Project Name:<\/strong> US Customs & Border Protection NDC1 Phase 2 Data Center Power Upgrade, Springfield, VA
\nArchitect\/Engineer\/General Contractor:<\/strong> Total Site Solutions<\/p>\n

Kenny Arrington, Donny Beach, Eddie Bihlear, Todd Fox, Donald Jacks, John Peyton – Truland Systems Corporation<\/em><\/h6>\n

Project Name:<\/strong> Gaylord National Resort and Convention Center, National Harbor, MD
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> Flack & Kurtz
\nGeneral Contractor:<\/strong> Perini\/Tompkins Joint Venture<\/p>\n

Marcos Gomez, Jim Keaveney, Barry Payne, Dave Thomas, Steve Whitehead – Dynalectric Company<\/em><\/h6>\n

Project Name:<\/strong> OCX Data Center, Ashburn, VA
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> CCG Facilities Integration, Inc.
\nGeneral Contractor:<\/strong> Holder Construction Company<\/p>\n

Scott Anderson, Fred Gast, Tim Holbrook, Joe LaQuay – Power Solutions, LLC<\/em><\/h6>\n

Project Name:<\/strong> Verizon Metro C.O. Standby Power Plant and Distribution System Upgrade, Washington, DC
\nArchitect:<\/strong> William Doggett Architects
\nEngineers:<\/strong> EDG2, Inc. \/ William Doggett Architects
\nGeneral Contractor:<\/strong> Chamberlain Construction<\/p>\n

Ian Buchanan, Mike Burch, Scott Gordon, Dave Spicher, Robert Turner – Dynalectric Company<\/em><\/h6>\n

Project Name:<\/strong> Chalk Point, Aquasko, MD
\nEngineer:<\/strong> ShawStone & Webster
\nGeneral Contractor:<\/strong> Shaw Constructors Inc.<\/p>\n

Joe Peterson – Truland Systems Corporation<\/em><\/h6>\n

Project Name:<\/strong> Nationals Park, Washington, DC
\nArchitect:<\/strong> HOK \/ Devrouax & Purnell Joint Venture
\nEngineer:<\/strong> Thornton Tomasetti \/ ReStl, A Joint Venture
\nGeneral Contractor:<\/strong> Clark \/ Hunt \/ Smoo t, A Joint Venture<\/p>\n

William Hurley, III, Chris Kendall, Buddy McDowell, Bruce Poetzman, William Poss, Mark Tayman – Power Solutions, LLC<\/em><\/h6>\n

Project Name:<\/strong> Digital Realty Trust Data Center, Ashburn, VA
\nArchitect\/Engineer:<\/strong> Highland Associates
\nGeneral Contractor:<\/strong> DPR Construction, Inc.<\/p>\n

Special Systems<\/h4>\n

(including security, control & instrumentation)<\/p>\n

Ryan Boyle, Robert Drescher, George Redding, Barry Williams – Dynatran, division of Dynalectric Company<\/em><\/h6>\n

Project Name:<\/strong> OCX Data Center, Ashburn, VA
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> CCG Facilities Integration, Inc.
\nGeneral Contractor:<\/strong> Holder Construction Company<\/p>\n

Pat Dunn, Mike Hajek, Ryan Short – Truland Systems Corporation<\/em><\/h6>\n

Project Name:<\/strong> Nationals Park, Washington, DC
\nArchitect:<\/strong> HOK \/ Devrouax & Purnell Joint Venture
\nEngineer:<\/strong> Thornton Tomasetti \/ ReStl, A Joint Venture
\nGeneral Contractor:<\/strong> Clark \/ Hunt \/ Smoot, A Joint Venture<\/p>\n

Victor Hewett, Doug Leggat, Tom Russek – Dynalectric Company<\/em><\/h6>\n

Project Name:<\/strong> OCX Data Center (Controls), Ashburn, VA
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> CCG Facilities Integration, Inc.
\nGeneral Contractor:<\/strong> Holder Construction Company<\/p>\n

Sinisa Bosnjak, John Lorence, Mike Person, Craig Semler – Natelco Corporation<\/em><\/h6>\n

Project Name:<\/strong> Provide Accessibility and Improve Ford\u2019s Theatre NHS, Washington, DC
\nArchitect:<\/strong> ASD
\nEngineer:<\/strong> Integral, Inc.
\nGeneral Contractor:<\/strong> Forrester Construction Company<\/p>\n

Anthony Connolly, Joel Hileman, Keith Koontz, John T. Utermohle – Dynalectric Company<\/em><\/h6>\n

Project Name:<\/strong> OCX Data Center (Fire Alarm), Ashburn, VA
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> EBL Engineers, LLC
\nGeneral Contractor:<\/strong> Holder Construction Company<\/p>\n

Kenny Bremmerman, Bernie Johnson – MONA Electric Group, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Folger Shakespeare Library, Washington, DC<\/p>\n

Finishes<\/span><\/h2>\n

Ceramic Tile and Terrazzo<\/h4>\n

Robert W. Cable, Bobby W. Campbell, Luca DeGennaro, Victor F. Portillo, Jacinto Torres, Girolamo (Jerry) Zimini, Jr. – Boatman and Magnani Inc.<\/em><\/h6>\n

Project Name:<\/strong> U.S. Capitol Visitor CenterSequence II (Tunnels), Washington, DC
\nArchitects:<\/strong> Architect of the Capitol and RTKL Associates Inc.
\nEngineer:<\/strong> S.M. Haw Associates, Inc.
\nGeneral Contractor:<\/strong> Manhattan Construction Company<\/p>\n

Fabio Amaya, Anthony John Applegarth, Jose Majano, German Mejia, Mike Trevisan – Roman Mosaic & Tile Company<\/em><\/h6>\n

Project Name:<\/strong> The Preserve at Tower OaksPhase II, Rockville, MD
\nArchitect:<\/strong> HOK
\nEngineer:<\/strong> Cagley & Associates, Inc.
\nGeneral Contractor:<\/strong> Bovis Lend Lease, Inc.<\/p>\n

Drywall<\/h4>\n

(including framing & finishing)<\/p>\n

Jose Bautista, Fredy Claure, Rick Gambrell, Martin Marin, Felix Rocha – Tricon Construction, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Volkswagen, Herndon, VA
\nArchitect:<\/strong> VOA Associates, Inc.
\nGeneral Contractor:<\/strong> Rand Construction Corporation<\/p>\n

Arcenio Alvarado, Eric Brooks, Eddie Freeman, Melvin Moreno, Santigo Orellena, Marlon Soriano – Compel Construction, Inc.<\/em><\/h6>\n

Project Name:<\/strong> ASCO, Alexandria, VA
\nArchitect:<\/strong> Leo A. Daly
\nGeneral Contractor:<\/strong> Rand Construction Corporation<\/p>\n

Ben Carper, Mike Fleener, Filiberto Flores, Concepcion Ramirez, Mark Schneibolk, Randy Wilson – FORM Construction Services<\/em><\/h6>\n

Project Name:<\/strong> Katten Muchin Rosenman LLP, Washington, DC
\nArchitect:<\/strong> Gensler
\nGeneral Contractor:<\/strong> Rand Construction Corporation<\/p>\n

Cristobal Avelar, Randy Custer, Eric Pare, Gerardo Ruvalcaba – P&P Contractors, Inc.<\/em><\/h6>\n

Project Name:<\/strong> 22 West, Washington, DC
\nArchitect:<\/strong> Shalom Baranes Associates
\nGeneral Contractor:<\/strong> Bovis Lend Lease, Inc.<\/p>\n

Jose Gonzales, Alberto Lopez, Ruben Lopez – DPR Drywall<\/em><\/h6>\n

Project Name:<\/strong> Digital Realty Trust Data Center, Ashburn, VA
\nArchitect:<\/strong> Highland Associates
\nGeneral Contractor:<\/strong> DPR Construction, Inc.<\/p>\n

Jesus Avelar, Luc Bureau, Todd Carlton, Juan Cornejo – Tristate Drywall, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Corporate Executive Board, Arlington, VA
\nArchitect:<\/strong> Gensler
\nEngineer:<\/strong> TOLK Inc.
\nGeneral Contractor:<\/strong> James G. Davis Construction Corporation<\/p>\n

Flooring<\/h4>\n

(including wood, carpet & resilient floor tile)<\/p>\n

John Baugher, Justin Garber – John\u2019s Wood Floor Specialist<\/em><\/h6>\n

Project Name:<\/strong> Rose Hardy Middle School, Washington, DC
\nArchitect:<\/strong> Einhorn Yaffee Prescott
\nGeneral Contractor:<\/strong> SIGAL Construction Corporation<\/p>\n

John Bennoit, David Keeney, John Keeney, Vernon Keeney, Harold Shipe – CB Flooring, LLC<\/em><\/h6>\n

Project Name:<\/strong> DIRECTV, Washington, DC
\nArchitect:<\/strong> Huntsman Architectural Group
\nGeneral Contractor:<\/strong> HITT Contracting Inc.<\/p>\n

Plaster<\/h4>\n

(including Stucco and Dryvitt)<\/p>\n

Raymond Andrews, Wes Bryant, Osborne Burke, Kevin Davis, Sr., Tavon Edmonds – Plastering Specialties, LLC<\/em><\/h6>\n

Project Name:<\/strong> Rose Hardy Middle School, Washington, DC
\nArchitect:<\/strong> Einhorn Yaffee Prescott
\nGeneral Contractor:<\/strong> SIGAL Construction Corporation<\/p>\n

Specialty Painting<\/h4>\n
Jesus Diaz, Victor Garcia, Roger Gustin, Luis Orellana, Tom Pilkerton, Kenneth Riley – Architect of the Capitol<\/em><\/h6>\n

Project Name:<\/strong> Freedom Statue Model Renovation, Washington, DC
\nStar Award Nominee<\/strong><\/span><\/p>\n

Fidencio Cruz, Roosevelt Hensley, Jr., Juan Rivera, German Umanzor, Osly Umanzor – Brownlee Painting & Wallcovering, Inc.<\/em><\/strong> Terry Brackenberry – Evergreene Painting Studios<\/em><\/strong><\/h6>\n

Project Name:<\/strong> Provide Accessibility and Improve Ford\u2019s Theatre NHS, Washington, DC
\nArchitect:<\/strong> ASD
\nGeneral Contractor:<\/strong> Forrester Construction Company<\/p>\n

Masonry<\/span><\/h2>\n

Exterior Stone<\/h4>\n

(including marble, granite & exterior pavers)<\/p>\n

Mevlut Beyen, Ismael Chicas, Behzat Kaplan, Vahap Karamese, Gokhan Kilic, Yakup Kilic – NEKA Marble and Granite, Inc.<\/em><\/h6>\n

Project Name:<\/strong> South MarketBlock 14, Reston, VA
\nArchitect:<\/strong> SmithGroup
\nGeneral Contractor:<\/strong> HITT Contracting Inc.<\/p>\n

Dave Adams, Jose Chirino, Frank Mayo, Jesus Tejada, Edwin Urena, Rene Zalaya – Pagliaro Brothers Stone Co., Inc.<\/em><\/h6>\n

Project Name:<\/strong> 2501 Pennsylvania Avenue Condominium, Washington, DC
\nArchitect:<\/strong> BBGM Architects & Interiors, PLLC
\nGeneral Contractor:<\/strong> Tompkins Builders, Inc.<\/p>\n

Mario Escobar, Oscar A. Fuentes, Jose Sieiro, Mario Leiva Tapia, Ivan Ventura – Lorton Contracting Company<\/em><\/h6>\n

Project Name:<\/strong> Georgetown UniversityMcDonough School of Business, Washington, DC
\nArchitect:<\/strong> Goody Clancy
\nGeneral Contractor:<\/strong> The Whiting\u2013Turner Contracting Company<\/p>\n

Interior Stone & Marble<\/h4>\n
Henry Choffrey, Manuel Fortes, Jose Jovell, Luis Medrano, Carroll Rodgers, John Rogers – Architect of the Capitol<\/em><\/h6>\n

Project Name:<\/strong> New Visitors ExperiencePhase 1, Washington, DC<\/p>\n

Vital B. Cardoso, Peter Machado, Daniel E. Mazariego, Santos Andres Paz, Boanerges E. Quintanilla Ramos – R. Bratti Associates, Inc.<\/em><\/h6>\n

Project Name:<\/strong> McPherson Lobby & Fa\u00e7ade Renovations, Washington, DC
\nArchitect:<\/strong> Leo A. Daly
\nGeneral Contractor:<\/strong> Forrester Construction Company<\/p>\n

Aric Guttry, JD Stenner – Atlantic Refinishing & Restoration, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Four Seasons Hotel (Royal Suite), Washington, DC
\nArchitect:<\/strong> LAN Associates
\nDesigner:<\/strong> Anderson Miller Ltd.
\nGeneral Contractor:<\/strong> SIGAL Construction Corporation<\/p>\n

Bob Radke, John Rooney, Jose Santamaria, Regis Studney, Jr. – Rugo Stone, LLC<\/em><\/h6>\n

Project Name:<\/strong> Morrison & Foerster LLP, Washington, DC
\nArchitect:<\/strong> Mancini \u2022 Duffy
\nGeneral Contractor:<\/strong> HITT Contracting Inc.
\nStar Award Nominee<\/strong><\/span><\/p>\n

Unit Masonry<\/h4>\n
Hugo Brizuela, Robert Emerson, Luis Zelaya – Genco Masonry, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Highland Park, Washington, DC
\nArchitect:<\/strong> Torti Gallas & Partners, Inc.
\nGeneral Contractor:<\/strong> S.E. Foster, L.P.<\/p>\n

Doug Dunkin – J.D. Long Masonry, Inc. <\/em><\/h6>\n

Project Name:<\/strong> Prince William\/Manassas Regional Adult Detention Center Expansion, Manassas, VA
\nArchitect:<\/strong> HOK
\nGeneral Contractor:<\/strong> Tompkins Builders, Inc.<\/p>\n

Dave Baker, Jose C. Gonzalez, Bob Markoff, Carlos Moreno, Lester Townsend, John Young – Calvert Masonry, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Dumont Condominiums, Washington, DC
\n\"\"Architect:<\/strong> Esocoff & Associates Architects
\nGeneral Contractor:<\/strong> James G. Davis Construction Corporation
\nThe building fa\u00e7ade of the DuMont Condominiums includes curved faces and angular corners, multiple masonry veneer materials and integrated cast stone window surrounds and balcony\/parapet cap stones. Three different brick colors with corresponding mortars colors, ground face\/split face concrete masonry units and glass block masonry units were installed on the building fa\u00e7ade and sitework. In all, over 150,000 CMU units, over 610,000 jumbo size brick, over 12,000 ground face\/split face CMU units and over 6,000 glass block masonry units were laid. Calvert also installed over 5,000 pieces of cast stone, consisting of handset and setting by machine or crane, several with welded connections. The flashing and air\/vapor barrier for each masonry component and between the masonry and various skin components required extensive reviews, redesigns and coordination, due, in part, to the unique building geometry. In addition, the irregular geometry and 800-foot fa\u00e7ade was accommodated by an extensive scaffold system.<\/em>
\nStar Award Winner for Visual \/ Technical Excellence<\/strong><\/span><\/p>\n

Mechanical<\/span><\/h2>\n

HVAC-Piping<\/h4>\n

David Blazek, Rich Lohr, Ray Milburn, Dustin Miller, Steve Souder, Steve Tayman – W.E. Bowers, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Building D Data Center Suite D120 Loudoun Exchange, Ashburn, VA
\nArchitect\/Engineer:<\/strong> Highland Associates
\nGeneral Contractor:<\/strong> DPR Construction, Inc.<\/p>\n

John Fischer, Mike Hayden, Mike Kuster, Ed Pierce – The Poole and Kent Corporation<\/em><\/h6>\n

Project Name:<\/strong> U.S. Capitol Power Plant West Refrigeration Plant Expansion, Washington, DC
\nArchitect:<\/strong> Architect of the Capitol
\nConstruction Manager:<\/strong> HILL International
\nEngineer:<\/strong> RMF Engineering, Inc.
\nGeneral Contractor:<\/strong> HITT Contracting Inc.<\/p>\n

Dave Bauer, Jimmy Briscoe, Greg Hurley, Robert Longfellow, Leonard Noone, James Waterman – W.E. Bowers, Inc.<\/em><\/h6>\n

Project Name:<\/strong> 1800 M Street Condenser Water Upgrade, Washington, DC
\nEngineer:<\/strong> KTA Group
\nGeneral Contractor:<\/strong> HITT Contracting Inc.<\/p>\n

Metals<\/span><\/h2>\n

Ornamental Metal<\/h4>\n

Ruben Cano, Jose Farias, Patrick Hoppman, Jose Muniz, Baltazar Perdomo, Michael Williams – Big D Metalworks<\/em><\/h6>\n

Project Name:<\/strong> Volkswagen, Herndon, VA
\nArchitect:<\/strong> VOA Associates, Inc.
\nGeneral Contractor:<\/strong> Rand Construction Corporation<\/p>\n

Structural Steel Framing<\/h4>\n
John Simmons, Richard Sprouse, Travis Sprouse, David Storm – MR Metals, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Provide Accessibility and Improve Ford\u2019s Theatre NHS, Washington, DC
\nArchitect:<\/strong> ASD
\nEngineer:<\/strong> ADTEK Engineers, Inc.
\nGeneral Contractor:<\/strong> Forrester Construction Company<\/p>\n

Alberto Felipe, Dennis Hodges, Heath Maxey, Javier Roman, Gustavo Ruiz, Tim Wyatt – Banker Steel Company<\/em><\/h6>\n

Project Name:<\/strong> 300 New Jersey Avenue, Washington, DC
\nArchitect:<\/strong> Richard Rogers Partnership
\nEngineer:<\/strong> SK&A Structural Engineers, PLLC
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Thomas J. Bowman, William D. Calhoun, Charles A. Eichelberger, Jr., Preston C. Oberholzer, Shane W. Rock, Rodney E. Timmons – Strait Steel, Inc.<\/em><\/h6>\n

Project Name:<\/strong> 55 M Street, Washington, DC
\nArchitect:<\/strong> Davis Carter Scott
\nEngineer:<\/strong> SK&A Structural Engineers, PLLC
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Sitework<\/span><\/h2>\n

Landscaping<\/h4>\n

(interior & exterior<\/p>\n

Jimmy Helms, Trenda Herring, Jason Holt, Dwayne Polk, Chad Price, C. Mac Rogers – Carolina Green Corporation<\/em><\/h6>\n

Project Name:<\/strong> Nationals Park, Washington, DC
\nArchitect:<\/strong> HOK \/ Devrouax & Purnell Joint Venture
\nEngineer:<\/strong> Thornton Tomasetti \/ ReStl, A Joint Venture
\nGeneral Contractor:<\/strong> Clark \/ Hunt \/ Smoot, A Joint Venture<\/p>\n

Underpinning, Foundations and Excavations<\/h4>\n
Mike Ayers, Chris Moen, Connie Plater, Rodney Spencer – Clark Foundations, LLC<\/em><\/h6>\n

Project Name:<\/strong> 55 M Street, Washington, DC
\nArchitect:<\/strong> Davis Carter Scott
\nEngineer:<\/strong> SK&A Structural Engineers, PLLC
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Mark Bougher, Jack Cunningham, Pablo Flores, Tony Franklin, Vic Garza, Berkly Preddy – Clark Foundations, LLC<\/em><\/h6>\n

Project Name:<\/strong> Clarendon Center, Arlington, VA
\nArchitect:<\/strong> Torti Gallas & Partners, Inc.
\nGeneral Contractor:<\/strong> Clark Construction Group, LLC<\/p>\n

Special Construction<\/span><\/h2>\n

Glass Fiber Reinforced Gypsum Panels<\/h4>\n

Pascual Balderrama, Billy Elder, Ovila Paquet, Claude Poston, Juan Lopez Sanchez, Edwin Velzaga – C. J. Coakley Co., Inc.<\/em><\/h6>\n

Project Name:<\/strong> Georgetown UniversityMcDonough School of Business, Washington, DC
\nArchitect:<\/strong> Goody Clancy
\nEngineer:<\/strong> ReStl Designers, Inc.
\nGeneral Contractor:<\/strong> The WhitingTurner Contracting Company<\/p>\n

Green Roof<\/h4>\n
Oscar Cruz Archaga, Alexi Cruz, Ernest Jones, Jr., Francisco Franco, Mon Min, Darvell Perry – Prospect Waterproofing Company<\/em><\/h6>\n

Project Name:<\/strong> North Bethesda Center, North Bethesda, MD
\nArchitect:<\/strong> ParkerRodriguez Associates
\nGeneral Contractor:<\/strong> Bovis Lend Lease, Inc.<\/p>\n

Interior Custom Metal Panels<\/h4>\n
Joe Bunger, Billy Elder, Mike Hiles, Ovila Paquet, Bobby Presley, Ted Woodward – C. J. Coakley Co., Inc.<\/em><\/h6>\n

Project Name:<\/strong> The Newseum Project, Washington, DC
\n\"\"Architect:<\/strong> Polshek Partnership Architects, LLP
\nGeneral Contractor:<\/strong> Turner Construction Company
\nThe custom panel work at the Newseum required concurrent installation at the residential apartment complex and public exhibit space. The specialty materials came from as far as California, Florida, the Carolinas and Germany. There were two specialty wood panel types to install, many special wall and ceiling assemblies, structural framing, acoustical fireproofing and metal panels. Metal panels from five manufacturers were installed in the Newseum. The challenge was the customization of the wall and ceiling panel systems throughout\u201d including walls up to 80 feet high, atrium ceilings, stairs and bridges with various angles and aesthetic lines and shapes. All of the systems required precise field measurement and calculations to make joints align throughout. At the exterior glass walls, installation occurred in less than two feet, barely enough room for a mechanic to work the metal panels on to the walls.<\/em>
\nStar Award Winner for Excellence in the Face of Adversity<\/strong><\/span><\/p>\n

Slate\/Copper Roofing<\/h4>\n
Lloyd Hunt (deceased), Harbhajan Khalsa, Rick Rapczynski, Philip Vargas, Jim Walker, Todd Walls – James R. Walls Contracting Co., Inc.<\/em><\/h6>\n

Project Name:<\/strong> Georgetown UniversityMcDonough School of Business, Washington, DC
\nArchitect:<\/strong> Goody Clancy
\nGeneral Contractor:<\/strong> The Whiting\u2013Turner Contracting Company<\/p>\n

Thermal and Moisture Protection<\/h4>\n
Mario Guatemala, Robert Thomas – Commercial Roofing and Sheet Metal Company<\/em><\/h6>\n

Project Name:<\/strong> Salvation Army, Washington, DC
\nArchitect:<\/strong> SmithGroup
\nGeneral Contractor:<\/strong> WCS Construction, LLC<\/p>\n

Oscar Cruz Archaga, Alexi Cruz, Francisco Franco, Mon Min, Darvell Perry, William Rivas – Prospect Waterproofing Company<\/em><\/h6>\n

Project Name:<\/strong> North Bethesda Center, North Bethesda, MD
\nArchitect:<\/strong> Dorsky Hodgson Parrish Yue
\nGeneral Contractor:<\/strong> Bovis Lend Lease, Inc.<\/p>\n

Shpetim Bunjaku, Colin Hoitt, Halil Kuqica, Sevdaim Mexhuani, Pete Morillo, Ismael Tejada – James Myers Company, Inc.<\/em><\/h6>\n

Project Name:<\/strong> King Hall Restoration, Annapolis, MD
\n\"\"Architect:<\/strong> RTKL Associates, Inc.
\nGeneral Contractor:<\/strong> Forrester Construction Company
\nThe restoration of King Hall at the United States Naval Academy required the complete removal of the existing roof and deck structure. The replacement structure used a combination of roofing types, including flat seam soldered copper, batten seam copper panels, flat seam copper wall panels and hot fluid-applied membrane roofing under granite and precast paving. The clerestory areas terminate in a detailed custom-formed copper cornice. James Myers Company evaluated the variety of roof types to improve the performance of the roofing. They replaced modified bitumen gutters with copper clad gutters; enhanced the slope of the lower roofs; replaced batten seam roofing at low slop areas with standing seam roofing; increased the gage of copper at critical trim and gutter areas and reworked slopes to provide power flow to existing through-wall scuppers and downspouts. The installers faced numerous challenges including detailed copper flashing at a variety of existing end conditions; working within tight tolerances at the new skylights and precast knee walls; and installing the work in a geometrically designed complex roof plan.<\/em>
\nStar Award Winner for Visual \/ Technical Excellence<\/strong><\/span><\/p>\n

Woods & Plastics<\/span><\/h2>\n

Architectural Millwork<\/h4>\n

Rick Baggett, Jerry Kitt, Chris Koontz, Timothy Meek – RC Koontz Carpentry, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Woodley House Renovation, Fairfax Station, VA
\nGeneral Contractor:<\/strong> Monarc Construction, Inc.
\nHighly skilled carpenters installed a series of custom-designed multi-piece base, trim and crown throughout Woodley House.
\nStar Award Nominee<\/strong><\/span><\/p>\n

John Minihane – Worcester Eisenbrandt, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Dominican House of StudiesPhase I, Washington, DC
\nArchitect:<\/strong> DeLizzio Architects & Planners
\nGeneral Contractor:<\/strong> The Whiting\u2013Turner Contracting Company<\/p>\n

Stanley Chraca, William Ignatowski, Chris Wojciechowski – United Woodworking, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Four Seasons Hotel (Lobby & Grand Stair), Washington, DC
\nArchitect:<\/strong> Jonathan Nehmer + Associates
\nDesigner:<\/strong> Pierre Yves Rochon
\nGeneral Contractor:<\/strong> SIGAL Construction Corporation<\/p>\n

Wally Braun, Michael Dziedzic, Tyler Hartman, Ted Piwowar, Scott Sherby, Richard Stiers – Imperial Woodworking Company<\/em><\/h6>\n

Project Name:<\/strong> Lerner Enterprises, Rockville, MD
\nArchitect:<\/strong> Gensler
\nGeneral Contractor:<\/strong> HITT Contracting Inc.<\/p>\n

Casework and Laminates<\/h4>\n
Terry Harvey, Travis Herbig, George Santoro, Kyle Schaefer, August Scherlitner, Philip Torre – Suburban Woodwork, Inc.<\/em><\/h6>\n

Project Name:<\/strong> Woodley House Renovation, Fairfax Station, VA
\nGeneral Contractor:<\/strong> Monarc Construction, Inc.
\nStar Award Nominee<\/strong><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"

Concrete | Doors & Windows | Electrical | Finishes | Masonry | Mechanical | Metals | Sitework | Special Construction […]<\/p>\n","protected":false},"author":1,"featured_media":935,"template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"craftsmanship_awards_category":[],"class_list":["post-5323","craftsmanship_awards","type-craftsmanship_awards","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"\n2009 Craftsmanship Awards Winners - Washington Building Congress<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"2009 Craftsmanship Awards Winners - Washington Building Congress\" \/>\n<meta property=\"og:description\" content=\"Concrete | Doors & Windows | Electrical | Finishes | Masonry | Mechanical | Metals | Sitework | Special Construction […]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/\" \/>\n<meta property=\"og:site_name\" content=\"Washington Building Congress\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-21T12:14:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"476\" \/>\n\t<meta property=\"og:image:height\" content=\"318\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/\",\"url\":\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/\",\"name\":\"2009 Craftsmanship Awards Winners - Washington Building Congress\",\"isPartOf\":{\"@id\":\"https:\/\/www.wbcnet.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg\",\"datePublished\":\"2009-10-17T15:51:02+00:00\",\"dateModified\":\"2023-04-21T12:14:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#primaryimage\",\"url\":\"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg\",\"contentUrl\":\"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg\",\"width\":476,\"height\":318},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.wbcnet.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2009 Craftsmanship Awards Winners\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.wbcnet.org\/#website\",\"url\":\"https:\/\/www.wbcnet.org\/\",\"name\":\"Washington Building Congress\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.wbcnet.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.wbcnet.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.wbcnet.org\/#organization\",\"name\":\"Washington Building Congress\",\"url\":\"https:\/\/www.wbcnet.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.wbcnet.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/04\/wbc-logo.svg\",\"contentUrl\":\"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/04\/wbc-logo.svg\",\"width\":290,\"height\":102,\"caption\":\"Washington Building Congress\"},\"image\":{\"@id\":\"https:\/\/www.wbcnet.org\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"2009 Craftsmanship Awards Winners - Washington Building Congress","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/","og_locale":"en_US","og_type":"article","og_title":"2009 Craftsmanship Awards Winners - Washington Building Congress","og_description":"Concrete | Doors & Windows | Electrical | Finishes | Masonry | Mechanical | Metals | Sitework | Special Construction […]","og_url":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/","og_site_name":"Washington Building Congress","article_modified_time":"2023-04-21T12:14:02+00:00","og_image":[{"width":476,"height":318,"url":"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/","url":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/","name":"2009 Craftsmanship Awards Winners - Washington Building Congress","isPartOf":{"@id":"https:\/\/www.wbcnet.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#primaryimage"},"image":{"@id":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#primaryimage"},"thumbnailUrl":"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg","datePublished":"2009-10-17T15:51:02+00:00","dateModified":"2023-04-21T12:14:02+00:00","breadcrumb":{"@id":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#primaryimage","url":"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg","contentUrl":"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/05\/2009Visual_Technical_Winner_1.jpg","width":476,"height":318},{"@type":"BreadcrumbList","@id":"https:\/\/www.wbcnet.org\/craftsmanship_awards\/2009-craftsmanship-awards-winners\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.wbcnet.org\/"},{"@type":"ListItem","position":2,"name":"2009 Craftsmanship Awards Winners"}]},{"@type":"WebSite","@id":"https:\/\/www.wbcnet.org\/#website","url":"https:\/\/www.wbcnet.org\/","name":"Washington Building Congress","description":"","publisher":{"@id":"https:\/\/www.wbcnet.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.wbcnet.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.wbcnet.org\/#organization","name":"Washington Building Congress","url":"https:\/\/www.wbcnet.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.wbcnet.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/04\/wbc-logo.svg","contentUrl":"https:\/\/www.wbcnet.org\/wp-content\/uploads\/2022\/04\/wbc-logo.svg","width":290,"height":102,"caption":"Washington Building Congress"},"image":{"@id":"https:\/\/www.wbcnet.org\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/craftsmanship_awards\/5323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/craftsmanship_awards"}],"about":[{"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/types\/craftsmanship_awards"}],"author":[{"embeddable":true,"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":44,"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/craftsmanship_awards\/5323\/revisions"}],"predecessor-version":[{"id":7963,"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/craftsmanship_awards\/5323\/revisions\/7963"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/media\/935"}],"wp:attachment":[{"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/media?parent=5323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/categories?post=5323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/tags?post=5323"},{"taxonomy":"craftsmanship_awards_category","embeddable":true,"href":"https:\/\/www.wbcnet.org\/wp-json\/wp\/v2\/craftsmanship_awards_category?post=5323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}